2nd Penang Crossing - Main Span, Malaysia

November 1, 2019

 

22 km roadway with seismically isolated main span. SSI was engaged as special consultants to assist  in the design and detailing of the SI System, a first in Malaysia. Slated for completion soon.

 

 

 

 

 

Share on Facebook
Share on Twitter
Please reload

Featured Posts

GGT Headquarters Building, Indonesia

November 18, 2019

1/5
Please reload

Recent Posts
Please reload

Archive
Please reload

Search By Tags
Please reload

Follow Us
  • Facebook Basic Square
  • Twitter Basic Square
  • Google+ Social Icon

© 2020 by Seismic Structures International